Rehabilitation and conversion of a 50,000 SF 5-story unreinforced concrete masonry and brick industrial facility to office space, including seismic analysis of existing facility and upgraded to current codes. Learn more »
Burkett & Wong Engineers carried out the preliminary investigation, prepared construction documents for the repairs and supervised the construction and work as it progressed. Learn more »
Structural investigation was carried out for the California Tower. Learn more »
Conducted the investigation, analysis, plans and specifications for the renovation of this steel cable-stayed pedestrian bridge with two laced-steel towers at each end of the span, pressure-treated wood deck and longitudinal weathering steel tube girders. Learn more »

